Hafod Y Gest Porthmadog

Scope: Asbestos Removal as part of demolition and rebuild
Client: Major Building Contractor
Sector: Former Council Care Home built in 1970’s which no longer could meet the needs of older people, to be replaced with high quality modern accommodation and care facilities for older people in the area.
Project Duration: 3 months

Detail:

The vacated building contained asbestos insulation board (AIB) ceiling tiles throughout the building which also had stud wall separation within rooms. The planned works involved the controlled removal of the AIB ceiling tiles and associated MMMF insulation and debris within the ceiling voids above, also to remove one face to stud wall to reveal any entrained asbestos debris for removal and subsequent demolition of the building by the Principal contractor.

The works were phased to account for the layout of the building dividing its floor plan into manageable areas to allow for safe transit for operators and waste removal, also to maintain emergency exits as a precaution.

Works were completed on time without disruption to the Principal Contractor’s schedules and providing on-going support as necessary as the project developed into the demolition and building phases.

The Site Manager representing the Client provided the following testimonial:-

“I would like to thank you all for the hard work your lads put in at Hafod y Gest, they were all a pleasure to have on site and very professional, a job well done.”

More Case Studies

Project: Nuclear Power Facility

Scope of Works: Asbestos Removal

The Site Manager representing the Client provided the following testimonial

“I would also like to pass on our client’s and my appreciation for the very professional way that you dealt with removing the asbestos from the facility. It was obvious that safety was paramount and I was impressed with how well your operatives prepared and carried out the work and cleaned up immaculately afterwards. A&D were professional from the first phone call and we couldn’t be happier with the service and results.”

Testimonial by: Major Building Contractor